With the continuing collaboration with the FEA in respect to rural electrification, a total of 77 grid extension schemes were paid to the Fiji Electricity Authority. Despite some progress, the actual constructions of some lines were delayed due to the cash flow problems within FEA. These were the result of the increasing operational cost (running cost of diesel generators) and other structural problems that were encountered by the FEA. As a result of these problems, some of the schemes remain to be completed.